Analyzing the Level of Detail of Construction Schedule for Enabling Site Logistics Planning (SLP) in the Building Information Modeling (BIM) Environment
Kolarić, S., Vukomanović, M. i Ramljak, A. (2022). Analyzing the Level of Detail of Construction Schedule for Enabling Site Logistics Planning (SLP) in the Building Information Modeling (BIM) Environment. Sustainability, 14(11)., 1-22. Preuzeto s https://urn.nsk.hr/urn:nbn:hr:237:301499
Kolarić, Sonja, et al. "Analyzing the Level of Detail of Construction Schedule for Enabling Site Logistics Planning (SLP) in the Building Information Modeling (BIM) Environment." Sustainability, vol. 14(11), 2022, str. 1-22. https://urn.nsk.hr/urn:nbn:hr:237:301499
Kolarić, Sonja, Mladen Vukomanović i Antonio Ramljak. "Analyzing the Level of Detail of Construction Schedule for Enabling Site Logistics Planning (SLP) in the Building Information Modeling (BIM) Environment." Sustainability 14(11) (2022): 1-22. https://urn.nsk.hr/urn:nbn:hr:237:301499
Kolarić, S., Vukomanović, M. i Ramljak, A. (2022) 'Analyzing the Level of Detail of Construction Schedule for Enabling Site Logistics Planning (SLP) in the Building Information Modeling (BIM) Environment', Sustainability, 14(11), str. 1-22. Preuzeto s: https://urn.nsk.hr/urn:nbn:hr:237:301499 (Datum pristupa: 25.12.2024.)
Kolarić S, Vukomanović M, Ramljak A. Analyzing the Level of Detail of Construction Schedule for Enabling Site Logistics Planning (SLP) in the Building Information Modeling (BIM) Environment. Sustainability [Internet]. 2022. [pristupljeno 25.12.2024.];14(11):1-22. Dostupno na: https://urn.nsk.hr/urn:nbn:hr:237:301499
S. Kolarić, M. Vukomanović i A. Ramljak, "Analyzing the Level of Detail of Construction Schedule for Enabling Site Logistics Planning (SLP) in the Building Information Modeling (BIM) Environment", Sustainability, vol. 14(11), str. 1-22, 2022. [Online]. Dostupno na: https://urn.nsk.hr/urn:nbn:hr:237:301499. [Citirano: 25.12.2024.]